C3 Church
This project included clearing, erosion control, wetland management, water lines, sewer lines storm drainage, retainage ponds, building site grading, off site borrow from US 70 Bypass, curb and gutter, stone base and asphalt paving.
Corinth Archer High School
Site of 100 plus acres with roadways, parking lots, clearing. grading, erosion control, mass excavation, water lines, sewer lines, storm drainage, curb and gutter, irrigation, sodding, retaining walls, athletic fields, running track, paving, striping, and signage requirements. This is a Turn Key site package award.